It also made the rest of the day rather harder work than it needed to have been.
First the electrics needed to be disconnected. A whole raft of wires and connection boxes sat above the kitchen door which needed careful dismantling and insulating.
Then a general dismantling of shelves, hooks, etc to see what could be salvaged before the messy stuff started.
Eventually I began to attack the georgian wired class roof. there are ten 8' panels, all puttied in and sealed with a self-adhesive silver waterproofing tape and small nails. it was very messy and by the time I the Eurovision Song Contest (won by Sweden with a totally forgettable song) started, I had removed 3.
On Sunday it rained. Still, on the bright side, it may keep the dust down when I start to break up the concrete and bricks.